Installation:
Turn off the power at the mains before installation.
Secure the ceiling plate firmly to a stable ceiling support.
Adjust suspension height (if adjustable) for your ceiling and table clearance.
Connect wiring according to regional standards (Live, Neutral, Ground).
Insert 6 × E14 bulbs (max wattage typically 40W per bulb).
Ensure all components are secure before switching the power back on.
Professional installation by a licensed electrician is recommended.
Care & Maintenance:
Wipe the copper frame with a soft, dry cloth — avoid harsh cleaners.
Clean glass panels with a microfiber cloth; if needed, use mild soapy water and dry immediately.
Do not spray cleaning solutions directly on the chandelier.
Periodically check screws, suspension wires, and ceiling mounts for stability.
Not suitable for damp or outdoor spaces.
Always allow bulbs and fixture to cool before handling.
💡 Pro Tip: Pair with warm-white LED E14 bulbs for a cozy, intimate dining space, or choose cool-white bulbs for a modern, bright finish.